VIPLogoStart Your Tulaoge,Choose VIP | | WAP Browse | RSS
Business Centre
Tulaoge
Publish Posts
Publish
Promote ranking
Ranking
 

track crane trolley

click to see the original picture
Product/ Service: track crane 
Brand: Jinzhou Tiegong 
Model: DC 
Unit Price: negotiable  quote
Minimum Order: 1 sets 
Total Amount of Supply:
Delivery: deliver within 5 days after the buyer has paid
Valid until: Always Valid
Last Update: 2012-07-09
Views: 903
Company Information
Please login for checking contact number
Free register as member,you could...
Release supply and demand information Sell Products
Build Company Shops Business Negotiations Online
Not member yet,free register now
 
 
Detailed information about this product


A, characteristics

DC type crane rail car, the structure is simple, light weight, easy to use, transport rail flexible reliable, is the railway works departments rail transport construction operation ideal special tools.

Second, the technical parameters

1, crane rail rated load: 1 T

2, the contour size, long x width × high: 3080 x 1020 x 1020 mm

3, the machine quality: 77 kg


Three, principle, structure

Principle: based on the principle of balance of leverage, through the hinge card (crane) hook will rail rail palatal parts card (clip) live, again with wheel tread and rails for supporting points at the top of the press operation lever, will lift the rail, and then, the side pressure helped operation lever, the side push rod operation, will need to place to rail removed.

Structure: by the card (crane) rail hook, running wheel, the rail device rack (operation lever, mandrels, the horizontal axis, etc) composition.

Four, use and maintenance

1, using radio 2 or more crane rail car, first will hang rail car wheels placed to ZouHangXian road on the rails, wheel tread and rails top surface contact, put steadily.

2, make card (crane) hook open, put in place to hang immediate rail, clamped rail rail palate, hang down rail car operation pole, which is of the lifting up of rail, smooth, side pressure helped push the operation will stem rail line along the railway).

3 and when will need to the position of the rail, lift up operation lever, rail be born the assignment.

4, before landing rail, should slow up up the operation stem, in case of operating rod suddenly raise cuts.

5, the wheel of the rolling bearing shaft supporting heart combination, and replace the grease injection to regularly; Hook the hinge pin shaft, want to often injecting grease, in order to protect crane rail car running flexible and not rust.

6, when for shipment rail line distance is farther, should first will move to be shipped to line near the rail, make the crane rail car card hook can hook position.



 


 
More..Other products from this company

[ Supplies Search ]  [ ]  [ Tell a Friend ]  [ Print ]  [ Close Window ]  [ Back To Top ]

 
 
Home | Copy Right | Service Agreement | Contact Us | About Us | Site map | Friend Link | Leave a message | Advertisement
广州土佬哥网络技术有限公司版权所有 | 粤ICP备16105204号
©2008-2012 TULAOGE B2B SYSTEM All Rights Reserved
网站公安机关备案号

粤公网安备 44010302000366号